Do You Need a Building Permit for Your Renovation in Ontario?

Illustration of a house, a toolbox and a building permit checklist
Home › Cleaning Guides › Do You Need a Building Permit for Your Renovation in Ontario?
Renovation · Ontario

Do You Need a Building Permit for Your Renovation in Ontario?

By the AnyClean team · Updated 26 November 2026 · Based on our own job records and official Canadian guidance

A permit protects you: it means a qualified inspector checks that the work meets the Ontario Building Code. Here is a plain-English guide to when you need one, based on Government of Ontario and City of Toronto guidance.

Key takeaways
  • In Ontario, permits come from your municipality’s building department, not the province.
  • Structural work, plumbing, HVAC, additions and basement apartments usually need a permit.
  • Like-for-like replacements, painting, flooring and cabinets usually don’t.
  • Building without a required permit can lead to orders to stop or remove work and fines of up to $50,000.
  • Always check with your own municipality before starting.
This is general information, not legal advice. Rules vary by municipality. Your local building department has the final say.

Who issues permits in Ontario

The Ontario Building Code is provincial, but permits are issued and inspected by your city or town’s building department. The Government of Ontario says you generally need a permit to construct a new building, add to or renovate an existing one, make structural repairs, change a building’s use, or install or change plumbing, heating and other building systems.

Work that usually needs a permit

  • Additions, and new buildings over 10 m² (including many sheds, garages and cabanas).
  • Removing or changing load-bearing walls, beams or posts.
  • New or changed plumbing, such as adding a bathroom or moving a kitchen sink.
  • New or altered heating, ventilation or fireplaces, including wood stoves.
  • Finishing a basement when walls, plumbing or structure change, and any second suite.
  • Decks more than 60 cm (about 2 ft) above the ground (City of Toronto).
  • New or enlarged window and door openings.
  • Underpinning and foundation repairs.

Work that usually doesn’t

  • Painting, wallpaper and flooring.
  • Replacing kitchen cabinets and countertops without moving plumbing.
  • Replacing windows or doors in the same-size opening.
  • Replacing plumbing fixtures like a sink, toilet or tub in the same location.
  • Small sheds under 10 m² (zoning rules may still apply).

Electrical work in Ontario is inspected separately by the Electrical Safety Authority (ESA), and a licensed electrical contractor normally files the notification.

How to apply

  1. Check zoning first. Setbacks, height and lot coverage can affect what you can build.
  2. Prepare drawings showing what exists and what is planned. Larger projects need a qualified designer.
  3. Apply to your municipality, usually online, and pay the fee.
  4. Wait for review. Ontario sets maximum review times based on project type, often 10 business days for a house.
  5. Book inspections at each stage listed on the permit, and keep the permit posted on site.

What happens if you skip it

Building without a required permit is an offence under the Building Code Act. The Government of Ontario notes fines of up to $50,000 for a first offence for an individual, and your municipality can order work to stop, be opened up for inspection, or be removed. Unpermitted work can also cause problems with insurance claims and when you sell.

Planning the end of the project

Build the final clean into your schedule: once the final inspection passes, the home is still full of fine dust. Book the clean for the day after the last trade leaves. Our post-renovation checklist shows what is involved, and our post-renovation cleaning crews cover Ontario and six other provinces.

Frequently asked questions

Do I need a permit to renovate a bathroom in Ontario?

Not to replace fixtures in the same place or redo tiles. You usually do if you add a bathroom, move plumbing or change walls.

Do I need a permit to finish my basement?

Usually yes if you build walls, add plumbing or a bathroom, change structure, or create a separate unit. Check with your municipality.

Who is responsible for getting the permit?

The property owner is responsible, though a contractor often applies on their behalf. Confirm in writing who is getting it.

What is the fine for building without a permit in Ontario?

Up to $50,000 for a first offence for an individual under the Building Code Act, and you may have to open up or remove the work.

Want it done for you?

Vetted, insured crews in Ontario, BC, Alberta, Saskatchewan, Manitoba, Nova Scotia and New Brunswick. Free 48-hour re-clean if anything is missed.

Get a free quoteSee prices

Related guides

Sources

  1. Government of Ontario — Building permits (Citizens’ guide to land use planning)
  2. City of Toronto — When do I need a building permit?

Our own figures come from AnyClean’s booking records: 5,684 completed jobs in seven provinces between May 2024 and October 2026. This guide is general information, not medical advice; for health concerns, speak to your doctor or local public health unit.

Leave a Reply

Your email address will not be published. Required fields are marked *